http://www.waimairibeachgolf.co.nz/
GRASS Ltd Principal Contractor
14 holes completed March 2012 to February 2013, final 4 holes currently under construction.
Installed 18 hole TORO irrigation system tees, greens, fairway, QVC outlets, plus two new pump station buildings.
Kristine Kerr Kura Design (Architect) Ph 027 437 4267